1. After stopping operation, all materials in the conveying pipe must be emptied, rinsed with clean water, drain the water in the machine, and hang a "Water Discharged" sign.
2. Before stopping work, the hydraulic concrete placing boom machine equipment should be maintained for a season, conduct a freezing point test on the antifreeze used, and replace the antifreeze suitable for the climate conditions of the region. Fuel, lubricating oil, and hydraulic oil must use the brands specified in winter, and preheating and heat preservation devices must be installed.
3. The
hydraulic concrete placing boom should be well insulated in winter. Equipment that cannot enter the room without conditions should be erected with a cold-proof shed. Large equipment stored in the open air should be parked in a sheltered place and should not be parked on the muddy or water-logged ground.