Construction operation technology
When loading the tanker for the first time, two more bags of cement should be added. After loading the concrete, the conveyor should keep rotating at a slow speed. Before unloading, the conveyor should speed up and rotate for 20 to 30 seconds before unloading.
When pumping concrete to pour the mannequin, there are two pouring sequences: layered pouring and side pile pouring. The end hoses should be moved evenly to control the thickness of each layer of fabric to 20 to 30cm. It should not be poured in piles. When pouring with horizontal pipes, as the concrete pouring direction moves, 1 to 2 people should be considered in the pouring area of each pump truck to watch the distribution boom and direct the distribution, and 6 to 8 workers should dismantle and assemble the pipes, and gradually lengthen or shorten them. , to adapt to the movement of the pouring part.