5. The shotcrete is not dense and hollow, causing water leakage on the initial support surface and corrosion on the surface of the steel frame;
6. Combining the above two reasons, before the entire initial support is not stable, it is caused by convergence and settlement, resulting in the exposed steel frame and the drop of the concrete surface; The loess has not been cleaned thoroughly.
2. Prevention and control measures:
① The surface of the steel frame and the shotcrete must be thoroughly cleaned. (For loess tunnels, water washing is strictly prohibited);
② When spraying, the spraying hand first sprays the back of the stuffing steel frame, and then sprays in layers with a thickness of 3-5cm per layer. For water-rich tunnels, try to take measures to reduce the long-term erosion of concrete by the accumulated water behind the initial support;
③ Short footage, strong support, early closure, and quick loop formation reduce disturbance to the original soil layer and reduce the exposure time of the original deeply buried soil layer; Except clean up.