5. The use, installation and wiring of the electrical control box must be carried out by professionals;
6. Concrete conveying The concrete in the hopper of this pump must be higher than the mixing shaft to avoid concrete splashing caused by inhalation of air;
7. After the pumping operation is completed, when transferring the pump to retract the outriggers, first retract the rear outriggers, put down the ground rollers, and retract the front outriggers;
8. The operator (the pump worker of the concrete delivery pump) technicians should record the working conditions of the concrete pump as required;
9. The concrete pump should be firmly fixed before use, and the four feet should be raised to make the tire off the ground, or the tire should be removed. Check the support of the hopper and chute on the upper part of the pump to ensure stability and reliability, and pay special attention to the casualties caused by the overturning of the pump. ;