Do you know how to operate the wet concrete spray shotcrete machine manipulator? I'll tell you today. Operation of wet spray manipulator: 1. It is strictly forbidden to use the manipulator as a crane or a lifting platform. 2. When moving the vehicle, the boom and sliding arm should be fully retracted in the parking position.
3. When the running distance is long, the manipulator should be turned to the transport position, and the arm should be supported by the support.
4. Only those who have undergone professional technical training and passed the examination can operate, use and maintain the equipment.
5. When using the remote control, the unintentional touch of the handle will cause the manipulator to move, so special attention should be paid to it.
6. Make sure that no one is in the danger area when extending the outriggers. The control device must be easy to operate to ensure safety.
7. The concrete sprayer should have a power cord of at least 80 meters long, the voltage and frequency used should meet the regulations, and the phase sequence should be determined.
8. It is not possible to move the vehicle and operate the manipulator at the same time. After the vehicle reaches the working position, it must be fixed to prevent rolling: use the handbrake, turn off the engine, and place the driving direction joystick in the neutral position.
9. Due to the heavy weight of the sprayer, it is required to place the ground tightly, so that the sprayer can be positioned reliably and in a horizontal state, and ensure that the vehicle outriggers are fully before starting the manipulator or concrete pump, or before pouring the sprayed material into the hopper. Reach out to prevent tipping.