7. After getting on the machine, the mobile or tower self climbing concrete placing boom operator must concentrate his thoughts, pay attention to the front distributing machine and the direction of rotation, and operate carefully.
8. The placing boom operator must clean the residual concrete in the pipe of the hydraulic placing machine after the cloth is finished, to prevent the remaining concrete in the pipe from agglomerating, causing pipe blockage, pipe bursting, and affecting normal use.
9. Clean, tighten, lubricate, and adjust carefully.
10. When repairing or maintaining the hydraulic concrete placing boom machine, the pipe rack must be folded, the safety hook must be hung, the boom must be placed horizontally, and the ground power supply must be cut off.